Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
281
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0614 # 14 Y:2024 | 14 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $5,321 | $3,260 | Implemented |
UF0614 # 05 Y:2024 | 05 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,952 | $39,000 | Implemented |
UF0614 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,910 | $351 | Implemented |
UF0614 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $35,722 | $41,798 | Implemented |
UF0614 # 13 Y:2024 | 13 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $27,969 | $60,000 | Implemented |
UF0614 # 12 Y:2024 | 12 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $10,444 | $4,280 | Implemented |
UF0614 # 07 Y:2024 | 07 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,473 | $24,140 | Implemented |
UF0614 # 03 Y:2024 | 03 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $24,631 | $18,563 | Implemented |
UF0614 # 10 Y:2024 | 10 | 2024 | ADJUST VENTS TO MINIMIZE ENERGY USE | $2,337 | $1,797 | Implemented |
UF0615 # 10 Y:2024 | 10 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,769 | $2,352 | Implemented |
UF0615 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $2,456 | $4,000 | Implemented |
UF0615 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,911 | $816 | Implemented |
UF0615 # 11 Y:2024 | 11 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $20,106 | $3,020 | Implemented |
UF0615 # 02 Y:2024 | 02 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $66,500 | $73,000 | Implemented |
UF0615 # 03 Y:2024 | 03 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $41,878 | $24,095 | Implemented |
UF0615 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,133 | $22,755 | Implemented |
UF0615 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,078 | $355 | Implemented |
UF0615 # 07 Y:2024 | 07 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $8,021 | $5,898 | Implemented |
UF0602 # 10 Y:2023 | 10 | 2023 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $215,016 | $0 | Implemented |
UF0602 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $339,285 | $786,250 | Implemented |
UF0602 # 02 Y:2023 | 02 | 2023 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $389,519 | $50,482 | Implemented |
UF0602 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $268,820 | $137,250 | Implemented |
UF0602 # 09 Y:2023 | 09 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $341,860 | $20,000 | Implemented |
UF0602 # 07 Y:2023 | 07 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $26,608 | $0 | Implemented |
UF0602 # 08 Y:2023 | 08 | 2023 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $13,084 | $4,788 | Implemented |