IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0232 # 08 Y:2024 08 2024 RECOVER WASTE HEAT FROM EQUIPMENT $2,946 $10,000 n/a
DL0232 # 09 Y:2024 09 2024 RECOVER WASTE HEAT FROM EQUIPMENT $9,568 $10,000 n/a
DL0232 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $4,060 $166 n/a
DL0232 # 07 Y:2024 07 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,850 $1,637 n/a
DL0232 # 17 Y:2024 17 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,477 $2,488 n/a
DL0232 # 06 Y:2024 06 2024 INSTALL TIMERS AND/OR THERMOSTATS $7,288 $84 n/a
DL0232 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,886 $5,000 n/a
DL0232 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $10,552 $112 n/a
DL0232 # 15 Y:2024 15 2024 UPGRADE CONTROLS ON COMPRESSORS $6,886 $20,000 n/a
DL0232 # 16 Y:2024 16 2024 UPGRADE CONTROLS ON COMPRESSORS $14,220 $30,000 n/a
DL0232 # 11 Y:2024 11 2024 INSULATE BARE EQUIPMENT $500 $340 n/a
DL0232 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $848 $0 n/a
DL0232 # 18 Y:2024 18 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $10,000 n/a
DL0232 # 14 Y:2024 14 2024 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,758 $1,500 n/a
DL0232 # 01 Y:2024 01 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,952 $0 n/a
DL0232 # 13 Y:2024 13 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,930 $7,995 n/a
DL0232 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,563 $0 n/a
DL0232 # 10 Y:2024 10 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $546 $0 n/a
DL0212 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $5,199 $6,100 Not Implemented
DL0212 # 05 Y:2022 05 2022 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,655 $5,200 Not Implemented
DL0212 # 01 Y:2022 01 2022 REPAIR FAULTY LOUVERS AND DAMPERS $20,616 $975 Not Implemented
DL0212 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,587 $13,450 Not Implemented
DL0212 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,912 $5,000 Not Implemented
DL0212 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,396 $21,500 Not Implemented
DL0212 # 06 Y:2022 06 2022 USE OPTIMUM THICKNESS INSULATION $692 $2,233 Not Implemented