Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
327
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0362 # 09 Y:1992 | 09 | 1992 | REPAIR AND ELIMINATE STEAM LEAKS | $869 | $600 | Implemented |
KU0362 # 10 Y:1992 | 10 | 1992 | INSTALL / REPAIR INSULATION ON STEAM LINES | $633 | $502 | Implemented |
KU0362 # 11 Y:1992 | 11 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $422 | $0 | Not Implemented |
KU0306 # 01 Y:1990 | 01 | 1990 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $12,917 | $1,500 | Not Implemented |
KU0306 # 02 Y:1990 | 02 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,435 | $200 | Not Implemented |
KU0306 # 03 Y:1990 | 03 | 1990 | OPTIMIZE PLANT POWER FACTOR | $20,507 | $33,600 | Not Implemented |
KU0306 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,107 | $1,966 | Not Implemented |
KU0306 # 05 Y:1990 | 05 | 1990 | IMPROVE LUBRICATION PRACTICES | $8,748 | $0 | Implemented |
KU0306 # 06 Y:1990 | 06 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,643 | $4,359 | Implemented |
KU0306 # 07 Y:1990 | 07 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,326 | $0 | Not Implemented |
KU0306 # 08 Y:1990 | 08 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $229 | $0 | Not Implemented |
OK0290 # 01 Y:1989 | 01 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $1,539 | $1,080 | Implemented |
OK0290 # 02 Y:1989 | 02 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,374 | $1,890 | Not Implemented |
OK0290 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,517 | $334 | Implemented |
OK0290 # 04 Y:1989 | 04 | 1989 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $575 | $2,279 | Not Implemented |
OK0291 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,092 | $668 | Implemented |
OK0291 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,376 | $18,000 | Not Implemented |
OK0291 # 03 Y:1989 | 03 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $973 | $909 | Implemented |
OK0291 # 04 Y:1989 | 04 | 1989 | IMPROVE LUBRICATION PRACTICES | $4,974 | $0 | Implemented |
OK0291 # 05 Y:1989 | 05 | 1989 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $356 | $480 | Not Implemented |
OK0291 # 06 Y:1989 | 06 | 1989 | INSTALL TURBULATORS | $1,310 | $2,450 | Not Implemented |
OK0291 # 07 Y:1989 | 07 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $844 | $1,500 | Implemented |
OK0291 # 08 Y:1989 | 08 | 1989 | COVER OPEN TANKS | $360 | $955 | Not Implemented |
OK0291 # 09 Y:1989 | 09 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,262 | $100 | Implemented |
KU0280 # 01 Y:1989 | 01 | 1989 | INSULATE BARE EQUIPMENT | $3,621 | $500 | Not Implemented |