Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,476
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0066 # 13 Y:2015 | 13 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $195 | $56 | Not Implemented |
WM0066 # 14 Y:2015 | 14 | 2015 | METER WASTE WATER | $144 | $375 | Not Implemented |
UD0924 # 01 Y:2015 | 01 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $56,347 | $2,000 | Implemented |
UD0924 # 02 Y:2015 | 02 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,953 | $0 | Not Implemented |
UD0924 # 03 Y:2015 | 03 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $38,906 | $1,200 | Implemented |
UD0924 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,861 | $0 | Not Implemented |
UD0924 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,293 | $470 | Implemented |
UD0924 # 06 Y:2015 | 06 | 2015 | INSULATE BARE EQUIPMENT | $22,071 | $7,500 | Implemented |
UD0924 # 07 Y:2015 | 07 | 2015 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $16,794 | $0 | Not Implemented |
UD0924 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,134 | $0 | Not Implemented |
UD0924 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $16,525 | $6,100 | Implemented |
UD0924 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,695 | $67,200 | Implemented |
UD0924 # 11 Y:2015 | 11 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $9,383 | $0 | Not Implemented |
UD0924 # 12 Y:2015 | 12 | 2015 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,382 | $0 | Implemented |
UD0924 # 13 Y:2015 | 13 | 2015 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $357,410 | $0 | Not Implemented |
TT0155 # 01 Y:2015 | 01 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $35,244 | $50 | Implemented |
TT0155 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,106 | $30,000 | Implemented |
TT0155 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,646 | $40,000 | Implemented |
TT0155 # 04 Y:2015 | 04 | 2015 | INSULATE BARE EQUIPMENT | $8,513 | $625 | Implemented |
TT0155 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,382 | $3,000 | Implemented |
SF0465 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,904 | $0 | Not Implemented |
SF0465 # 02 Y:2015 | 02 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $1,344 | $648 | Implemented |
SF0465 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,965 | $3,081 | Not Implemented |
SF0465 # 04 Y:2015 | 04 | 2015 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $914 | $1,510 | Not Implemented |
SF0465 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,736 | $26,646 | Implemented |