IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

576

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0066 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,849 $14,148 n/a
IC0066 # 09 Y:2003 09 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,071 $78,893 n/a
BD0238 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,787 $24,780 Implemented
BD0238 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,453 $500 Implemented
BD0238 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $1,978 $1,650 Implemented
BD0238 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,134 $370 Implemented
BD0238 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,110 $3,285 Implemented
BD0238 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $656 $0 Implemented
BD0238 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $577 $465 Implemented
BD0238 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $527 $500 Not Implemented
BD0238 # 09 Y:2003 09 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $494 $1,000 Not Implemented
BD0238 # 10 Y:2003 10 2003 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $20,714 $7,000 Not Implemented
BD0238 # 11 Y:2003 11 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,280 $1,000 Implemented
BD0238 # 12 Y:2003 12 2003 PURCHASE EQUIPMENT INSTEAD OF LEASING $93,048 $395,000 Not Implemented
BD0238 # 13 Y:2003 13 2003 AUTOMATE PAYROLL SYSTEM $2,808 $7,000 Not Implemented
IC0043 # 01 Y:2002 01 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $700 $578 Implemented
IC0043 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,789 $81,125 Implemented
IC0043 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $117 $1,822 Implemented
IC0043 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $705 $783 Not Implemented
IC0043 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $965 $1,169 Implemented
IC0043 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,481 $3,120 Implemented
IC0043 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,358 $26,100 Implemented
IC0043 # 08 Y:2002 08 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $98,945 $37,525 Not Implemented
BD0213 # 01 Y:2002 01 2002 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $40,151 $138,000 Not Implemented
BD0213 # 02 Y:2002 02 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $29,490 $10,000 Implemented