IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,307

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0465 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $1,171 $816 Implemented
WV0465 # 09 Y:2013 09 2013 DEVELOP A REPAIR/REPLACE POLICY $174 $415 Implemented
WV0465 # 10 Y:2013 10 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $155 $90 Implemented
UD0875 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,925 $4,300 Not Implemented
UD0875 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,208 $1,000 Not Implemented
UD0875 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,013 $0 Implemented
UD0875 # 04 Y:2013 04 2013 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $10,323 $0 Not Implemented
UD0875 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,804 $5,000 Not Implemented
UD0875 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $4,345 $1,205 Not Implemented
UD0868 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,535 $0 Implemented
UD0868 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,026 $107,140 Not Implemented
UD0868 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $1,542 $1,350 Implemented
UD0868 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,282 $0 Implemented
UD0868 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $2,154 $380 Not Implemented
UD0868 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,591 $2,000 Not Implemented
UD0868 # 07 Y:2012 07 2012 UPGRADE CONTROLS ON COMPRESSORS $682 $1,000 Implemented
UD0868 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,792 $1,000 Implemented
UD0868 # 09 Y:2012 09 2012 COVER OPEN TANKS $1,393 $800 Not Implemented
UD0868 # 10 Y:2012 10 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,355 $2,415 Not Implemented
UD0868 # 11 Y:2012 11 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,912 $5,400 Implemented
UD0868 # 12 Y:2012 12 2012 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $665 $2,000 Not Implemented
UD0867 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,897 $12,947 Implemented
UD0867 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,726 $35,503 Implemented
UD0867 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,088 $10,618 Implemented
UD0867 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,831 $0 Not Implemented