IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,307

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0409 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $3,087 $625 Implemented
WV0409 # 05 Y:2010 05 2010 RECOVER MECHANICAL ENERGY $2,064 $1,000 Not Implemented
WV0409 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,693 $985 Not Implemented
WV0409 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,490 $600 Implemented
WV0409 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,480 $0 Implemented
WV0409 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,292 $3,520 Implemented
WV0409 # 10 Y:2010 10 2010 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,165 $400 Not Implemented
WV0409 # 11 Y:2010 11 2010 USE OPTIMUM THICKNESS INSULATION $1,139 $625 Not Implemented
WV0409 # 12 Y:2010 12 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $544 $690 Not Implemented
UD0816 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $2,978 $0 Not Implemented
UD0816 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,468 $0 Implemented
UD0816 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,881 $0 Implemented
UD0816 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,929 $0 Implemented
UD0816 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,108 $0 Implemented
UD0816 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $22,144 $0 Implemented
UD0816 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $346 $0 Not Implemented
UD0816 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $6,179 $0 Not Implemented
UD0816 # 09 Y:2010 09 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $15,412 $0 Implemented
UD0816 # 10 Y:2010 10 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,601 $0 Not Implemented
UD0816 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,426 $0 Implemented
UD0816 # 12 Y:2010 12 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,512 $0 Implemented
UD0816 # 13 Y:2010 13 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,524 $0 Not Implemented
UD0816 # 14 Y:2010 14 2010 INSTALL TIMERS AND/OR THERMOSTATS $10,027 $0 Not Implemented
UD0816 # 15 Y:2010 15 2010 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,123 $0 Not Implemented
UD0816 # 16 Y:2010 16 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $766 $0 Not Implemented