IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0212 # 05 Y:2022 05 2022 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,655 $5,200 Not Implemented
DL0212 # 10 Y:2022 10 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,304 $22,424 Not Implemented
DL0212 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $278 $210 Not Implemented
DL0198 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,850 $0 Implemented
DL0198 # 04 Y:2021 04 2021 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $16,090 $1,500 Not Implemented
DL0198 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $29,500 $0 Not Implemented
DL0198 # 08 Y:2021 08 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,320 $7,000 Not Implemented
DL0198 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,740 $14,428 Implemented
DL0198 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $2,034 $5,600 Not Implemented
DL0198 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,100 $6,477 Not Implemented
DL0198 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,800 $0 Implemented
DL0198 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,240 $2,500 Implemented
DL0196 # 01 Y:2021 01 2021 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,944 $6,452 Not Implemented
DL0196 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $1,842 $2,864 Implemented
DL0196 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,469 $18,418 Implemented
DL0196 # 04 Y:2021 04 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $110 $20 Not Implemented
DL0196 # 08 Y:2021 08 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,629 $13,777 Not Implemented
DL0196 # 03 Y:2021 03 2021 INSTALL TIMERS AND/OR THERMOSTATS $509 $165 Not Implemented
DL0196 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,762 $1,037 Not Implemented
DL0196 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $849 $0 Implemented
DL0195 # 09 Y:2021 09 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,430 $7,309 Implemented
DL0195 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,950 $8,214 Implemented
DL0195 # 10 Y:2021 10 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,190 $6,328 Not Implemented
DL0195 # 11 Y:2021 11 2021 INSTALL OCCUPANCY SENSORS $290 $270 Not Implemented
DL0195 # 12 Y:2021 12 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,495 $34,144 Implemented