Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,324
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0306 # 07 Y:2004 | 07 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,120 | $520 | Not Implemented |
WV0306 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $985 | $160 | Implemented |
WV0306 # 09 Y:2004 | 09 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $934 | $160 | Implemented |
WV0306 # 10 Y:2004 | 10 | 2004 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $796 | $40 | Implemented |
WV0306 # 11 Y:2004 | 11 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $777 | $1,060 | Not Implemented |
WV0306 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $696 | $3,480 | Implemented |
WV0306 # 13 Y:2004 | 13 | 2004 | INSTALL OCCUPANCY SENSORS | $395 | $800 | Implemented |
WV0306 # 14 Y:2004 | 14 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $318 | $105 | Not Implemented |
TA0081 # 01 Y:2004 | 01 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $24,080 | $31,600 | Not Implemented |
TA0081 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,775 | $0 | Implemented |
TA0081 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,360 | $0 | Implemented |
TA0081 # 04 Y:2004 | 04 | 2004 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $11,120 | $2,795 | Not Implemented |
TA0081 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,390 | $40 | Implemented |
TA0081 # 06 Y:2004 | 06 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,255 | $190 | Not Implemented |
TA0081 # 07 Y:2004 | 07 | 2004 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,035 | $0 | Implemented |
TA0081 # 08 Y:2004 | 08 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,880 | $0 | Not Implemented |
UM0265 # 01 Y:2004 | 01 | 2004 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $105,689 | $64,000 | n/a |
UM0265 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,525 | $30,000 | n/a |
UM0265 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,733 | $15,532 | n/a |
UM0265 # 04 Y:2004 | 04 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $11,886 | $30,000 | n/a |
UM0265 # 05 Y:2004 | 05 | 2004 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $6,581 | $10,000 | n/a |
UM0265 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,069 | $975 | Not Implemented |
UM0265 # 07 Y:2004 | 07 | 2004 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,652 | $250 | Not Implemented |
UM0265 # 08 Y:2004 | 08 | 2004 | COVER OPEN TANKS | $855 | $1,500 | Not Implemented |
UM0264 # 01 Y:2004 | 01 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $47,250 | $2,600 | Implemented |