IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13,403

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0422 # 04 Y:2023 04 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,309 $280 Implemented
MI0422 # 05 Y:2023 05 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,579 $4,001 Implemented
MI0422 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $394 $0 Implemented
TR0040 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,084 $4,166 Implemented
TR0040 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $11,309 $128,100 Not Implemented
TR0040 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,078 $15,000 Implemented
IC0276 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,114 $7,997 Implemented
IC0276 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $83,404 $10,984 Implemented
IC0276 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $102,187 $5,165 Not Implemented
IC0276 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $6,347 $3,405 Implemented
IC0276 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $1,869 $2,547 Not Implemented
IC0276 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,020 $4,424 Not Implemented
IC0276 # 07 Y:2023 07 2023 INSULATE BARE EQUIPMENT $12,027 $90 Not Implemented
IC0276 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $992 $1,773 Not Implemented
IC0276 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $85,492 $1,202,972 Not Implemented
IC0276 # 10 Y:2023 10 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $155,920 $1,014,736 Not Implemented
AS0545 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $45,564 $673,751 Not Implemented
AS0545 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $40,798 $10,720 Not Implemented
AS0545 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,883 $1,698 Not Implemented
AS0545 # 04 Y:2023 04 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $174 $8 Not Implemented
AM0877 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $35,600 $148,000 Implemented
AM0877 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,440 $105 Implemented
AM0877 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,290 $74,067 Implemented
AM0877 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,900 $60,360 Implemented
AM0877 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,700 $32,850 Implemented