Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,539
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0286 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $2,292 | $0 | Implemented |
SD0286 # 08 Y:2002 | 08 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $262,070 | $1,200,000 | Not Implemented |
SD0286 # 09 Y:2002 | 09 | 2002 | USE EVAPORATION TO CONCENTRATE MATERIAL | $540 | $300 | Implemented |
SD0286 # 10 Y:2002 | 10 | 2002 | USE EVAPORATION TO CONCENTRATE MATERIAL | $122,879 | $200,000 | Not Implemented |
SD0286 # 11 Y:2002 | 11 | 2002 | INSTALL EQUIPMENT TO MOVE PRODUCT | $9,000 | $3,500 | Implemented |
SD0286 # 12 Y:2002 | 12 | 2002 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $28,610 | $35,000 | Not Implemented |
SD0286 # 13 Y:2002 | 13 | 2002 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $20,964 | $25,000 | Not Implemented |
SD0286 # 14 Y:2002 | 14 | 2002 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $3,348 | $7,000 | Implemented |
SD0286 # 15 Y:2002 | 15 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,380 | $3,000 | Implemented |
SD0286 # 16 Y:2002 | 16 | 2002 | CHANGE OPERATING CONDITIONS | $2,333 | $0 | Implemented |
CO0497 # 01 Y:2001 | 01 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,250 | $12,000 | n/a |
CO0497 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,610 | $22,110 | Implemented |
CO0497 # 03 Y:2001 | 03 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,470 | $7,170 | Implemented |
CO0497 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,230 | $440 | Implemented |
CO0497 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $770 | $430 | Implemented |
CO0497 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $0 | Implemented |
CO0497 # 07 Y:2001 | 07 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $87,600 | $6,280 | Implemented |
CO0497 # 08 Y:2001 | 08 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,760 | $250 | Implemented |
CO0499 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,240 | $84,240 | Not Implemented |
CO0499 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,480 | $7,000 | Implemented |
CO0499 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $610 | $260 | Implemented |
CO0499 # 04 Y:2002 | 04 | 2002 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $540 | $900 | Implemented |
CO0499 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $190 | $0 | Implemented |
CO0499 # 06 Y:2002 | 06 | 2002 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $105,600 | $120,000 | Not Implemented |
OK0627 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,445 | $200 | Not Implemented |