Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0179 # 06 Y:1999 | 06 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,000 | $2,500 | Not Implemented |
NC0179 # 05 Y:1999 | 05 | 1999 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $4,315 | $1,425 | Implemented |
NC0179 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $164 | $800 | Not Implemented |
NC0179 # 03 Y:1999 | 03 | 1999 | ADD AREA LIGHTING SWITCHES | $121 | $640 | Not Implemented |
NC0179 # 02 Y:1999 | 02 | 1999 | USE PHOTOCELL CONTROLS | $128 | $120 | Not Implemented |
NC0179 # 01 Y:1999 | 01 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $453 | $340 | Implemented |
GT0628 # 04 Y:1997 | 04 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,263 | $5,550 | n/a |
GT0628 # 07 Y:1997 | 07 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $37,000 | $0 | n/a |
GT0628 # 06 Y:1997 | 06 | 1997 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $23,066 | $72,100 | n/a |
GT0628 # 05 Y:1997 | 05 | 1997 | MINIMIZE WATER USAGE | $2,924 | $0 | n/a |
GT0628 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,903 | $37,960 | n/a |
GT0628 # 02 Y:1997 | 02 | 1997 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $186,200 | $245,000 | n/a |
GT0628 # 01 Y:1997 | 01 | 1997 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $86,500 | $120,000 | n/a |
TN0380 # 06 Y:1989 | 06 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,869 | $440 | Not Implemented |
TN0380 # 01 Y:1989 | 01 | 1989 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $67,651 | $61,200 | Implemented |
TN0380 # 02 Y:1989 | 02 | 1989 | REPAIR AND ELIMINATE STEAM LEAKS | $4,181 | $75 | Implemented |
TN0380 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,143 | $6,750 | Implemented |
TN0380 # 04 Y:1989 | 04 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,910 | $420 | Implemented |
TN0380 # 05 Y:1989 | 05 | 1989 | INSTALL SET-BACK TIMERS | $6,151 | $6,350 | Not Implemented |