Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,279
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0240 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,067 | $2,600 | Implemented |
SD0240 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $193 | $714 | Implemented |
SD0240 # 04 Y:2000 | 04 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $52,416 | $31,000 | Not Implemented |
SD0240 # 05 Y:2000 | 05 | 2000 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $6,552 | $6,000 | Implemented |
SF0174 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,862 | $3,899 | Not Implemented |
SF0174 # 02 Y:1999 | 02 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $600 | $364 | Implemented |
SF0174 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $39,185 | $52,900 | Not Implemented |
SF0174 # 04 Y:1999 | 04 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $588 | $1,949 | Implemented |
SF0174 # 05 Y:1999 | 05 | 1999 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $604 | $0 | Implemented |
SF0174 # 06 Y:1999 | 06 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $29,453 | $34,995 | Not Implemented |
SF0174 # 07 Y:1999 | 07 | 1999 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,673 | $0 | Implemented |
SF0174 # 08 Y:1999 | 08 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $9,463 | $4,000 | Not Implemented |
SF0174 # 09 Y:1999 | 09 | 1999 | OPTIMIZE PLANT POWER FACTOR | $1,062 | $1,729 | Not Implemented |
SF0173 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $358 | $451 | Not Implemented |
SF0173 # 02 Y:1999 | 02 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $269 | $506 | Not Implemented |
SF0173 # 03 Y:1999 | 03 | 1999 | INSTALL OCCUPANCY SENSORS | $423 | $1,200 | Not Implemented |
SF0173 # 04 Y:1999 | 04 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,455 | $7,000 | Not Implemented |
SF0173 # 05 Y:1999 | 05 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $14,305 | $14,475 | Not Implemented |
SF0173 # 06 Y:1999 | 06 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $56,000 | $0 | Not Implemented |
SF0173 # 07 Y:1999 | 07 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,500 | $164 | Not Implemented |
SF0173 # 08 Y:1999 | 08 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $112,000 | $49,860 | Not Implemented |
SD0232 # 01 Y:1999 | 01 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,010 | $11,160 | Implemented |
SD0232 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,708 | $21,250 | Implemented |
SD0232 # 03 Y:1999 | 03 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,337 | $2,500 | Not Implemented |
SD0232 # 04 Y:1999 | 04 | 1999 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $6,905 | $7,400 | Not Implemented |