IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13,535

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0225 # 14 Y:2000 14 2000 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $9,938 $100 Not Implemented
UD0589 # 01 Y:2000 01 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $240,319 $400,000 Not Implemented
UD0589 # 02 Y:2000 02 2000 EXPAND OPERATIONS INTO UNUSED SPACE $35,731 $0 Not Implemented
UD0589 # 03 Y:2000 03 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $34,765 $0 Implemented
UD0589 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $5,192 $640 Implemented
UD0589 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,943 $6,246 Not Implemented
UD0589 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,077 $4,500 Not Implemented
WI0366 # 01 Y:2000 01 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $23,840 $71,500 Not Implemented
WI0366 # 02 Y:2000 02 2000 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $23,087 $0 Not Implemented
WI0366 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,458 $3,013 Not Implemented
WI0366 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,884 $0 Not Implemented
WI0366 # 05 Y:2000 05 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,628 $6,060 Not Implemented
WI0366 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,996 $4,934 Not Implemented
WI0366 # 07 Y:2000 07 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,500 $0 Not Implemented
CO0456 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $5,620 $15,400 n/a
CO0456 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,920 $470 n/a
CO0456 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,910 $4,030 n/a
CO0456 # 04 Y:2000 04 2000 DIRECT WARMEST AIR TO COMBUSTION INTAKE $930 $1,400 n/a
CO0456 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $0 n/a
CO0456 # 06 Y:2000 06 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $407,670 $10,000 n/a
CO0456 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $130 $0 n/a
CO0456 # 08 Y:2000 08 2000 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $31,200 $25,000 n/a
CO0456 # 09 Y:2000 09 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,850 $250 n/a
TN0677 # 01 Y:2000 01 2000 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $30,000 $30,000 Not Implemented
TN0677 # 02 Y:2000 02 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,356 $5,625 Implemented