Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,535
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0274 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $27,426 | $27,050 | n/a |
ME0274 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,039 | $14,259 | n/a |
ME0274 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,786 | $14,670 | n/a |
ME0274 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,882 | $825 | n/a |
ME0274 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,789 | $7,571 | n/a |
ME0274 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,182 | $500 | n/a |
ME0274 # 07 Y:1999 | 07 | 1999 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $371 | $980 | n/a |
ME0274 # 08 Y:1999 | 08 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $470 | $100 | n/a |
ME0274 # 09 Y:1999 | 09 | 1999 | ELIMINATE/REDUCE AN OPERATION | $16,433 | $2,400 | n/a |
ME0274 # 10 Y:1999 | 10 | 1999 | MINIMIZE WATER USAGE | $1,674 | $868 | n/a |
ME0274 # 11 Y:1999 | 11 | 1999 | MINIMIZE WATER USAGE | $120 | $85 | n/a |
AR0169 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,698 | $6,378 | Implemented |
AR0169 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,846 | $2,882 | Not Implemented |
AR0169 # 03 Y:1999 | 03 | 1999 | METER WASTE WATER | $672 | $500 | Not Implemented |
AR0169 # 04 Y:1999 | 04 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $42,399 | $1,284 | Not Implemented |
OD0145 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,482 | $38,557 | Not Implemented |
OD0145 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $275 | $20 | Not Implemented |
OD0145 # 03 Y:1999 | 03 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,280 | $495 | Implemented |
OD0145 # 04 Y:1999 | 04 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,396 | $220 | Implemented |
UD0579 # 01 Y:1999 | 01 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $250,000 | $325,000 | Not Implemented |
UD0579 # 02 Y:1999 | 02 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $25,726 | $7,500 | Implemented |
UD0579 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $9,050 | $8,000 | Implemented |
UD0579 # 04 Y:1999 | 04 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $7,690 | $2,850 | Implemented |
UD0579 # 05 Y:1999 | 05 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,782 | $2,000 | Not Implemented |
UD0579 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $910 | $0 | Implemented |