IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,307

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0233 # 10 Y:2002 10 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,934 $1,800 Implemented
WV0233 # 11 Y:2002 11 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $934 $50 Implemented
WV0233 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,023 $10,350 Implemented
WV0233 # 13 Y:2002 13 2002 BURN WASTE OIL FOR HEAT $7,659 $2,960 Not Implemented
WV0233 # 14 Y:2002 14 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,875 $740 Not Implemented
WV0233 # 15 Y:2002 15 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,800 $50 Implemented
WV0233 # 16 Y:2002 16 2002 MODIFY WORKLOAD $28,611 $5,200 Not Implemented
UD0635 # 01 Y:2002 01 2002 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $73,991 $0 Not Implemented
UD0635 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $12,374 $2,380 Not Implemented
UD0635 # 03 Y:2002 03 2002 FILTER AND REUSE HYDRAULIC OIL $5,357 $3,323 Not Implemented
UD0635 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,701 $0 Not Implemented
UD0635 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,985 $2,775 Not Implemented
UD0635 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,588 $2,775 Not Implemented
UD0635 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,549 $3,104 Not Implemented
UD0635 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $993 $1,725 Not Implemented
UD0635 # 09 Y:2002 09 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $1,800 Implemented
UD0635 # 10 Y:2002 10 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $446 $0 Not Implemented
UD0635 # 11 Y:2002 11 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $232 $361 Not Implemented
UD0634 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $7,175 $1,720 Not Implemented
UD0634 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,762 $400 Implemented
UD0634 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,426 $700 Not Implemented
UD0634 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,372 $0 Implemented
UD0634 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,089 $132 Implemented
UD0634 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $704 $600 Implemented
UD0633 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,223 $4,000 Not Implemented