IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13,106

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0232 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,886 $5,000 n/a
UF0602 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $848,231 $3,118,500 n/a
UF0602 # 02 Y:2023 02 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $389,519 $50,482 n/a
UF0602 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $339,285 $786,250 n/a
UF0602 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $268,820 $137,250 n/a
UF0602 # 05 Y:2023 05 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $117,532 $250,000 n/a
UF0602 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $72,743 $322,608 n/a
UF0602 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $26,608 $0 n/a
UF0602 # 08 Y:2023 08 2023 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $13,084 $4,788 n/a
UF0602 # 09 Y:2023 09 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $341,860 $20,000 n/a
UF0602 # 10 Y:2023 10 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $215,016 $0 n/a
CW0129 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,398 $72,618 n/a
CW0129 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,872 $21,000 n/a
CW0129 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $951 $180 n/a
CW0129 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,343 $37,000 n/a
CW0129 # 02 Y:2023 02 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $21,901 $86,580 n/a
CW0129 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $10,973 $2,300 n/a
UC2313 # 01 Y:2023 01 2023 PAY UTILITY BILLS ON TIME $275 $0 n/a
UC2313 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $4,527 $1,500 n/a
UC2313 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,066 $3,500 n/a
UC2313 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $732 $428 n/a
UC2313 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $873 $1,300 n/a
UC2313 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $251 $50 n/a
UC2313 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,805 $75 n/a
UC2313 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,884 $16,157 n/a