Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

507

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0160 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,174 $0 Implemented
MU0011 # 03 Y:2022 03 2022 REPAIR AND ELIMINATE STEAM LEAKS $13,523 $284 Implemented
MU0011 # 02 Y:2022 02 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $32,543 $74 Not Implemented
MU0011 # 01 Y:2022 01 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $361 $0 Implemented
IP0138 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,642 $0 Not Implemented
IP0138 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $296 $0 Not Implemented
IP0138 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,178 $425 Not Implemented
IP0138 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $6,110 $4,000 Not Implemented
IP0138 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,920 $3,260 Not Implemented
IP0138 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,582 $32,713 Not Implemented
IC0239 # 01 Y:2020 01 2020 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $11,777 $0 Not Implemented
IC0239 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,780 $0 Not Implemented
IC0239 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,851 $5,000 Not Implemented
IC0239 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,411 $4,168 Not Implemented
IC0239 # 05 Y:2020 05 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $11,954 $26,400 Not Implemented
IC0239 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,041 $3,075 Not Implemented
IC0221 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,226 $7,471 Implemented
IC0221 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,682 $4,200 Implemented
IC0221 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $8,629 $5,550 Not Implemented
IP0114 # 08 Y:2019 08 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,040 $4,200 Not Implemented
IP0114 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,152 $20,160 Implemented
IP0114 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $681 $680 Not Implemented
IP0114 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,093 $150 Implemented
IP0114 # 04 Y:2019 04 2019 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,320 $480 Not Implemented
IP0114 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $245 $10 Implemented