IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

347

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0456 # 08 Y:2000 08 2000 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $31,200 $25,000 n/a
CO0456 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $130 $0 n/a
CO0456 # 06 Y:2000 06 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $407,670 $10,000 n/a
CO0456 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $0 n/a
CO0456 # 04 Y:2000 04 2000 DIRECT WARMEST AIR TO COMBUSTION INTAKE $930 $1,400 n/a
CO0456 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,910 $4,030 n/a
CO0456 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,920 $470 n/a
CO0456 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $5,620 $15,400 n/a
CO0438 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,090 $100 Implemented
CO0438 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60 $482 Implemented
CO0438 # 03 Y:1999 03 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $388 $0 Not Implemented
CO0438 # 05 Y:1999 05 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $330,000 $740,000 Not Implemented
CO0438 # 06 Y:1999 06 1999 SCHEDULE DELIVERIES ACCORDING TO DEMAND $21,760 $20,000 Not Implemented
CO0438 # 04 Y:1999 04 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $260 $0 Not Implemented
CO0435 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,640 $8,000 Not Implemented
CO0435 # 07 Y:1999 07 1999 MODIFY STARTUP/SHUTDOWN TIMES $10,920 $0 Not Implemented
CO0435 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $210 $134 Implemented
CO0435 # 05 Y:1999 05 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $310 $100 Implemented
CO0435 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $370 $500 Implemented
CO0435 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $570 $710 Not Implemented
CO0435 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,380 $2,000 Implemented
CO0435 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,870 $14,850 Not Implemented
CO0433 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $71,760 $60,000 Not Implemented
CO0433 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $220 $20 Not Implemented
CO0433 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $340 $0 Not Implemented