IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

298

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0209 # 07 Y:1999 07 1999 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,225 $8,000 Not Implemented
HO0209 # 06 Y:1999 06 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $39,910 $63,000 Not Implemented
HO0209 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $3,541 $1,468 Not Implemented
HO0209 # 04 Y:1999 04 1999 USE OPTIMUM THICKNESS INSULATION $24,609 $13,620 Not Implemented
HO0209 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $570 Implemented
HO0209 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $1,005 $1,600 Implemented
HO0209 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,002 $55,668 Not Implemented
HO0193 # 06 Y:1999 06 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,000 $300 Implemented
HO0193 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,758 $16,993 Implemented
HO0193 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $785 $1,000 Implemented
HO0193 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,524 $360 Implemented
HO0193 # 04 Y:1999 04 1999 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $395 $400 Implemented
HO0193 # 07 Y:1999 07 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,872 $3,500 Not Implemented
HO0193 # 08 Y:1999 08 1999 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $2,000 $10,000 Not Implemented
HO0193 # 05 Y:1999 05 1999 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $825 $2,000 Implemented
HO0193 # 09 Y:1999 09 1999 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $5,000 $3,000 Not Implemented
HO0190 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,715 $15,311 Not Implemented
HO0190 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,478 $39,600 Not Implemented
HO0190 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $39,503 $85,000 Not Implemented
HO0190 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,524 $2,500 Implemented
HO0190 # 05 Y:1999 05 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,100 $360 Implemented
HO0130 # 11 Y:1996 11 1996 INCREASE USE OF AUTOMATION $65,363 $26,200 Implemented
HO0130 # 10 Y:1996 10 1996 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $130,320 $186,569 Not Implemented
HO0130 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $179,887 $800,000 Not Implemented
HO0130 # 05 Y:1996 05 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,718 $5,590 Implemented