Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
298
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0209 # 07 Y:1999 | 07 | 1999 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $3,225 | $8,000 | Not Implemented |
HO0209 # 06 Y:1999 | 06 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $39,910 | $63,000 | Not Implemented |
HO0209 # 05 Y:1999 | 05 | 1999 | INSULATE BARE EQUIPMENT | $3,541 | $1,468 | Not Implemented |
HO0209 # 04 Y:1999 | 04 | 1999 | USE OPTIMUM THICKNESS INSULATION | $24,609 | $13,620 | Not Implemented |
HO0209 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,540 | $570 | Implemented |
HO0209 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $1,005 | $1,600 | Implemented |
HO0209 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,002 | $55,668 | Not Implemented |
HO0193 # 06 Y:1999 | 06 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000 | $300 | Implemented |
HO0193 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,758 | $16,993 | Implemented |
HO0193 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $785 | $1,000 | Implemented |
HO0193 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,524 | $360 | Implemented |
HO0193 # 04 Y:1999 | 04 | 1999 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $395 | $400 | Implemented |
HO0193 # 07 Y:1999 | 07 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,872 | $3,500 | Not Implemented |
HO0193 # 08 Y:1999 | 08 | 1999 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $2,000 | $10,000 | Not Implemented |
HO0193 # 05 Y:1999 | 05 | 1999 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $825 | $2,000 | Implemented |
HO0193 # 09 Y:1999 | 09 | 1999 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $5,000 | $3,000 | Not Implemented |
HO0190 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,715 | $15,311 | Not Implemented |
HO0190 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,478 | $39,600 | Not Implemented |
HO0190 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $39,503 | $85,000 | Not Implemented |
HO0190 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,524 | $2,500 | Implemented |
HO0190 # 05 Y:1999 | 05 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,100 | $360 | Implemented |
HO0130 # 11 Y:1996 | 11 | 1996 | INCREASE USE OF AUTOMATION | $65,363 | $26,200 | Implemented |
HO0130 # 10 Y:1996 | 10 | 1996 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $130,320 | $186,569 | Not Implemented |
HO0130 # 03 Y:1996 | 03 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $179,887 | $800,000 | Not Implemented |
HO0130 # 05 Y:1996 | 05 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $35,718 | $5,590 | Implemented |