IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

327

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0500 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,400 $5,230 Implemented
KU0500 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,290 $950 Implemented
KU0500 # 04 Y:1998 04 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $1,910 $0 Implemented
KU0500 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,050 $700 Implemented
KU0500 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $1,750 $420 Implemented
KU0500 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,160 $220 Implemented
KU0500 # 08 Y:1998 08 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,220 $8,000 Implemented
KU0500 # 09 Y:1998 09 1998 RECOVER AND REUSE WASTE MATERIAL $2,100 $150 Implemented
KU0500 # 10 Y:1998 10 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $155,520 $450,000 Implemented
KU0500 # 11 Y:1998 11 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $44,060 $22,950 Not Implemented
KU0500 # 12 Y:1998 12 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $32,660 $2,260 Implemented
KU0494 # 01 Y:1998 01 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $20,790 $8,520 Implemented
KU0494 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,030 $1,400 Implemented
KU0494 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,510 $19,700 Implemented
KU0494 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,960 $2,390 Not Implemented
KU0494 # 05 Y:1998 05 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,100 $1,250 Not Implemented
KU0494 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $510 $720 Implemented
KU0494 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $880 Implemented
KU0494 # 08 Y:1998 08 1998 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $4,260 $9,000 Not Implemented
KU0494 # 09 Y:1998 09 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $30,350 $31,830 Implemented
KU0494 # 10 Y:1998 10 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,330 $6,280 Not Implemented
KU0481 # 01 Y:1997 01 1997 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $30,340 $21,800 Not Implemented
KU0481 # 02 Y:1997 02 1997 INSULATE BARE EQUIPMENT $24,670 $27,000 Implemented
KU0481 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,190 $25,840 Implemented
KU0481 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,890 $650 Not Implemented