Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,476
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0947 # 08 Y:2016 | 08 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $368 | $822 | Not Implemented |
OK0947 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,092 | $2,000 | Not Implemented |
OK0947 # 10 Y:2016 | 10 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $362 | $540 | Not Implemented |
WV0529 # 01 Y:2016 | 01 | 2016 | INSULATE BARE EQUIPMENT | $3,852 | $1,833 | Not Implemented |
WV0529 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,370 | $980 | Not Implemented |
WV0529 # 03 Y:2016 | 03 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,056 | $1,000 | Not Implemented |
WV0529 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $993 | $125 | Implemented |
WV0529 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $651 | $1,922 | Implemented |
WV0529 # 06 Y:2016 | 06 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $624 | $1,090 | Not Implemented |
WV0529 # 07 Y:2016 | 07 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $498 | $585 | Implemented |
WV0529 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $234 | $90 | Implemented |
WV0529 # 09 Y:2016 | 09 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $83 | $168 | Implemented |
UM0470 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,893 | $2,000 | n/a |
UM0470 # 02 Y:2016 | 02 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,012 | $5,000 | n/a |
UM0470 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $1,272 | $2,500 | n/a |
UM0470 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $819 | $3,700 | n/a |
WM0088 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $71,275 | $132,797 | Not Implemented |
WM0088 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $75,376 | $50,000 | Not Implemented |
WM0088 # 03 Y:2016 | 03 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,940 | $28,000 | Not Implemented |
WM0088 # 04 Y:2016 | 04 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,075 | $501 | Not Implemented |
WM0088 # 05 Y:2016 | 05 | 2016 | METER WASTE WATER | $4,267 | $375 | Not Implemented |
WM0088 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,245 | $0 | Implemented |
WM0088 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,531 | $6,000 | Not Implemented |
SD0541 # 01 Y:2016 | 01 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $51,914 | $30,240 | Not Implemented |
SD0541 # 02 Y:2016 | 02 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,692 | $1,454 | Implemented |