IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

114

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0814 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,694 $12,100 Implemented
MA0814 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,788 $12,100 Implemented
MA0814 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,091 $65,600 Not Implemented
MA0814 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,887 $69,625 Not Implemented
MA0814 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,857 $4,096 Implemented
MA0814 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $89,868 $533,354 Not Implemented
MA0649 # 01 Y:2009 01 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,752 $85,000 Not Implemented
MA0649 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,617 $63,000 Not Implemented
MA0649 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $2,945 $3,000 Implemented
MA0649 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,212 $10,500 Not Implemented
MA0555 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $212,625 $986,100 Implemented
MA0555 # 08 Y:2004 08 2004 INSTALL TIMERS AND/OR THERMOSTATS $1,139 $650 Implemented
MA0555 # 03 Y:2004 03 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $1,915 $44,790 Implemented
MA0555 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $2,840 $500 Implemented
MA0555 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,282 $5,430 Implemented
MA0555 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $1,836 $768 Implemented
MA0555 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,791 $4,850 Implemented
MA0555 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $535 $180 Implemented
MA0555 # 02 Y:2004 02 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,690 $81,637 Implemented
MA0543 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,705 $21,900 n/a
MA0543 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,265 $0 Not Implemented
MA0543 # 04 Y:2003 04 2003 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,292 $0 Not Implemented
MA0543 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,953 $12,400 Not Implemented
MA0543 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,571 $12,104 Implemented
MA0543 # 07 Y:2003 07 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,408 $527 Implemented