Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
340
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0209 # 01 Y:2024 | 01 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $9,737 | $0 | n/a |
WM0209 # 02 Y:2024 | 02 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,576 | $1,700 | n/a |
WM0209 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,224 | $0 | n/a |
WM0209 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,061 | $3,250 | n/a |
WM0209 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,372 | $0 | n/a |
WM0200 # 01 Y:2023 | 01 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $8,579 | $10,000 | Not Implemented |
WM0200 # 02 Y:2023 | 02 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $4,500 | $12,375 | Not Implemented |
WM0200 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,827 | $3,344 | Implemented |
WM0200 # 04 Y:2023 | 04 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,847 | $800 | Implemented |
WM0200 # 05 Y:2023 | 05 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,426 | $750 | Implemented |
WM0200 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,252 | $1,288 | Implemented |
WM0195 # 04 Y:2023 | 04 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,436 | $3,735 | Not Implemented |
WM0195 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $1,997 | $1,000 | Implemented |
WM0195 # 03 Y:2023 | 03 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $5,128 | $1,700 | Not Implemented |
WM0195 # 02 Y:2023 | 02 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $15,091 | $13,400 | Not Implemented |
WM0195 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,725 | $13,127 | Implemented |
WM0195 # 05 Y:2023 | 05 | 2023 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,687 | $0 | Implemented |
WM0195 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,142 | $1,715 | Not Implemented |
WM0195 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,381 | $700 | Implemented |
WM0195 # 08 Y:2023 | 08 | 2023 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,986 | $2,700 | Implemented |
WM0181 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,587 | $6,099 | Not Implemented |
WM0181 # 06 Y:2022 | 06 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $715 | $0 | Implemented |
WM0181 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,550 | $2,213 | Not Implemented |
WM0181 # 04 Y:2022 | 04 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $863 | $603 | Not Implemented |