Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
492
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DS0075 # 04 Y:1996 | 04 | 1996 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $21,114 | $0 | Not Implemented |
DS0075 # 05 Y:1996 | 05 | 1996 | INSTALL SET-BACK TIMERS | $2,926 | $150 | Implemented |
DS0075 # 01 Y:1996 | 01 | 1996 | OPTIMIZE PLANT POWER FACTOR | $2,348 | $1,700 | Implemented |
DS0075 # 06 Y:1996 | 06 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,520 | $0 | Implemented |
DS0075 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,487 | $21,753 | Implemented |
DS0075 # 03 Y:1996 | 03 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,576 | $8,500 | Implemented |
CO0378 # 02 Y:1996 | 02 | 1996 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,590 | $630 | Implemented |
CO0378 # 05 Y:1996 | 05 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $500 | $0 | Implemented |
CO0378 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,430 | $15,373 | Implemented |
CO0378 # 03 Y:1996 | 03 | 1996 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $1,940 | $1,790 | Not Implemented |
CO0378 # 07 Y:1996 | 07 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $330 | $150 | Implemented |
CO0378 # 04 Y:1996 | 04 | 1996 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,770 | $3,010 | Not Implemented |
SF0105 # 06 Y:1996 | 06 | 1996 | TURN OFF EQUIPMENT WHEN NOT IN USE | $651 | $600 | Implemented |
SF0105 # 03 Y:1996 | 03 | 1996 | INSTALL OCCUPANCY SENSORS | $532 | $1,560 | Not Implemented |
CO0378 # 08 Y:1996 | 08 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44 | $58 | Implemented |
SF0105 # 07 Y:1996 | 07 | 1996 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $809 | $250 | Implemented |
SF0105 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,020 | $5,900 | Implemented |
SF0105 # 01 Y:1996 | 01 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $856 | $3,000 | Implemented |
SF0105 # 05 Y:1996 | 05 | 1996 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,782 | $1,960 | Not Implemented |
SF0105 # 02 Y:1996 | 02 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $905 | $1,082 | Implemented |
CO0378 # 06 Y:1996 | 06 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $360 | $160 | Implemented |
CO0378 # 09 Y:1996 | 09 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $200 | $160 | Not Implemented |
AM0285 # 01 Y:1996 | 01 | 1996 | OPTIMIZE PLANT POWER FACTOR | $49,000 | $70,000 | Implemented |
AM0285 # 03 Y:1996 | 03 | 1996 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,830 | $5,660 | Implemented |
AM0285 # 04 Y:1996 | 04 | 1996 | SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM | $465 | $0 | Not Implemented |