Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
701
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0455 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $93,496 | $240,000 | Not Implemented |
MA0455 # 02 Y:1999 | 02 | 1999 | USE MINIMUM SAFE OVEN VENTILATION | $33,134 | $16,250 | Not Implemented |
MA0455 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,701 | $16,000 | Not Implemented |
MA0455 # 03 Y:1999 | 03 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $24,310 | $50,000 | Not Implemented |
MA0455 # 05 Y:1999 | 05 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,122 | $8,000 | Not Implemented |
MS0146 # 03 Y:1999 | 03 | 1999 | USE PHOTOCELL CONTROLS | $276 | $222 | Not Implemented |
MS0146 # 09 Y:1999 | 09 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $16 | $0 | Implemented |
MS0146 # 08 Y:1999 | 08 | 1999 | USE RE-USABLE FILTERS | $4,800 | $648 | Implemented |
MS0146 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PLANT POWER FACTOR | $2,236 | $2,610 | Not Implemented |
MS0146 # 07 Y:1999 | 07 | 1999 | INSULATE BARE EQUIPMENT | $2,189 | $2,446 | Not Implemented |
MS0146 # 06 Y:1999 | 06 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,736 | $4,200 | Not Implemented |
MS0146 # 05 Y:1999 | 05 | 1999 | INSTALL OCCUPANCY SENSORS | $192 | $346 | Not Implemented |
MS0146 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $635 | $89 | Not Implemented |
MS0146 # 02 Y:1999 | 02 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $50 | $119 | Implemented |
MS0146 # 10 Y:1999 | 10 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $4,000 | $5,246 | Implemented |
MA0454 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,113 | $11,700 | Not Implemented |
MA0454 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $5,776 | $16,250 | Not Implemented |
MA0454 # 03 Y:1999 | 03 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $667 | $2,675 | Not Implemented |
GT0680 # 03 Y:1999 | 03 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,310 | $450 | Implemented |
KU0535 # 02 Y:1999 | 02 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,250 | $2,640 | Implemented |
GT0680 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $1,120 | $2,000 | Not Implemented |
GT0680 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,057 | $4,527 | Implemented |
KU0535 # 03 Y:1999 | 03 | 1999 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,870 | $1,250 | Implemented |
GT0680 # 06 Y:1999 | 06 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $38,165 | $11,480 | Not Implemented |
KU0535 # 01 Y:1999 | 01 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $16,650 | $200 | Not Implemented |