Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
574
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0244 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $2,023 | $521 | Implemented |
UM0244 # 01 Y:2003 | 01 | 2003 | ADOPT IN-HOUSE MATERIAL GENERATION | $101,745 | $30,000 | Not Implemented |
UM0244 # 03 Y:2003 | 03 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $582 | $2,477 | Not Implemented |
UM0244 # 04 Y:2003 | 04 | 2003 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $26,499 | $51,860 | Not Implemented |
UM0244 # 02 Y:2003 | 02 | 2003 | SIZE TRUCKS TO JOB | $76,800 | $54,000 | Implemented |
UM0244 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,934 | $13,221 | Not Implemented |
MA0543 # 04 Y:2003 | 04 | 2003 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $5,292 | $0 | Not Implemented |
MA0543 # 02 Y:2003 | 02 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $26,717 | $40,000 | Not Implemented |
MA0543 # 07 Y:2003 | 07 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,408 | $527 | Implemented |
MA0543 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,265 | $0 | Not Implemented |
MA0543 # 06 Y:2003 | 06 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,571 | $12,104 | Implemented |
MA0543 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,705 | $21,900 | n/a |
MA0543 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,953 | $12,400 | Not Implemented |
BD0248 # 16 Y:2003 | 16 | 2003 | USE POWER DURING OFF-PEAK PERIODS | $7,578 | $2,000 | Not Implemented |
BD0248 # 12 Y:2003 | 12 | 2003 | USE PHOTOCELL CONTROLS | $363 | $225 | Not Implemented |
BD0248 # 09 Y:2003 | 09 | 2003 | INSTALL OCCUPANCY SENSORS | $1,196 | $1,575 | Not Implemented |
BD0248 # 01 Y:2003 | 01 | 2003 | INSULATE BARE EQUIPMENT | $48,696 | $13,832 | n/a |
BD0248 # 17 Y:2003 | 17 | 2003 | AUTOMATE PAYROLL SYSTEM | $936 | $2,500 | Not Implemented |
BD0248 # 02 Y:2003 | 02 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,672 | $24,600 | n/a |
BD0248 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,760 | $1,000 | Implemented |
BD0248 # 13 Y:2003 | 13 | 2003 | USE SYNTHETIC LUBRICANT | $74 | $200 | Not Implemented |
BD0248 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,140 | $23,175 | Implemented |
BD0248 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,613 | $450 | Not Implemented |
BD0248 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,492 | $0 | Implemented |
BD0248 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,847 | $4,555 | Implemented |