IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

181

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TS0022 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,325 $480 Not Implemented
TS0022 # 04 Y:1985 04 1985 INSTALL SET-BACK TIMERS $2,580 $1,000 Not Implemented
TS0022 # 05 Y:1985 05 1985 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $10,224 $3,000 Not Implemented
MA0021 # 01 Y:1985 01 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $454 $0 Implemented
MA0021 # 02 Y:1985 02 1985 BURN WOOD BY-PRODUCTS FOR HEAT $2,010 $8,450 Implemented
MA0021 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,822 $105 Implemented
MA0021 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $435 $100 Not Implemented
MA0021 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,005 $3,702 Not Implemented
MA0021 # 06 Y:1985 06 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,902 $4,380 Not Implemented
CO0022 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,005 $812 Implemented
CO0022 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $235 $300 Implemented
CO0022 # 03 Y:1985 03 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,655 $5,000 Not Implemented
CO0022 # 04 Y:1985 04 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,408 $2,500 Not Implemented
CO0022 # 05 Y:1985 05 1985 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $111 $100 Implemented
CO0022 # 06 Y:1985 06 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,775 $100 Implemented
CO0022 # 07 Y:1985 07 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,991 $4,000 Not Implemented
CO0022 # 08 Y:1985 08 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $898 $100 Implemented
CO0022 # 09 Y:1985 09 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $253 $12 Implemented
CO0022 # 10 Y:1985 10 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $77 $0 Implemented
MA0020 # 01 Y:1985 01 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $11,592 $6,000 Implemented
MA0020 # 02 Y:1985 02 1985 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $9,754 $56,300 Implemented
MA0020 # 03 Y:1985 03 1985 USE RADIANT HEATER FOR SPOT HEATING $4,696 $13,000 Not Implemented
MA0020 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $852 $100 Implemented
TN0239 # 01 Y:1985 01 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,129 $180 Implemented
TN0239 # 02 Y:1985 02 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,382 $0 Implemented