IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0058 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,613 $446 Not Implemented
RU0058 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,807 $0 Not Implemented
RU0058 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,950 $2,500 Not Implemented
RU0058 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,672 $594 Not Implemented
RU0058 # 05 Y:1989 05 1989 AIR CONDITION ONLY SPACE NECESSARY $2,996 $7,200 Not Implemented
RU0058 # 06 Y:1989 06 1989 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,605 $11,500 Not Implemented
RU0054 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,192 $159 Not Implemented
RU0054 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,566 $0 Not Implemented
RU0054 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,084 $0 Implemented
RU0054 # 04 Y:1989 04 1989 IMPROVE LUBRICATION PRACTICES $1,897 $800 Not Implemented
RU0054 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,240 $0 Not Implemented
RU0054 # 06 Y:1989 06 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,711 $8,300 Implemented
RU0054 # 07 Y:1989 07 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,481 $9,000 Not Implemented
KU0280 # 01 Y:1989 01 1989 INSULATE BARE EQUIPMENT $3,621 $500 Not Implemented
KU0280 # 02 Y:1989 02 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,382 $0 Implemented
KU0280 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $2,032 Not Implemented
KU0280 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $440 $100 Implemented
KU0280 # 05 Y:1989 05 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $250 $0 Implemented
KU0280 # 06 Y:1989 06 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $293 $560 Not Implemented
KU0280 # 07 Y:1989 07 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $143 $40 Implemented
MA0142 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,859 $570 Implemented
MA0142 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $39,982 $5,700 Not Implemented
MA0142 # 03 Y:1989 03 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $42,075 $45,870 Not Implemented
MA0142 # 04 Y:1989 04 1989 INSTALL SET-BACK TIMERS $6,809 $900 Not Implemented
MA0142 # 05 Y:1989 05 1989 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $43,200 $381,000 Not Implemented