IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0497 # 07 Y:2001 07 2001 $87,600 $6,280 Implemented
CO0497 # 08 Y:2001 08 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,760 $250 Implemented
CO0497 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $0 Implemented
CO0497 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $770 $430 Implemented
CO0497 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,230 $440 Implemented
CO0497 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,470 $7,170 Implemented
CO0497 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,610 $22,110 Implemented
OK0627 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,466 $9,056 Implemented
UU0003 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,867 $140 Implemented
UU0003 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $2,062 $4,761 Implemented
IA0279 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $13,986 $3,040 Implemented
IA0279 # 08 Y:2001 08 2001 USE POWER DURING OFF-PEAK PERIODS $16,097 $0 Implemented
IA0279 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,459 $422 Implemented
IA0279 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,011 $40 Implemented
IA0279 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,176 $614 Implemented
OK0621 # 04 Y:2001 04 2001 $50,500 $25,810 Implemented
OK0621 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,550 $1,185 Implemented
OK0621 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,536 $13,800 Implemented
OK0621 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,000 $300 Implemented
NC0221 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $508 $455 Implemented
NC0221 # 06 Y:2001 06 2001 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $47,842 $92,321 Implemented
NC0221 # 04 Y:2001 04 2001 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $3,060 $8,000 Implemented
NC0221 # 03 Y:2001 03 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $44,663 $500 Implemented
UM0196 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,496 $2,500 Implemented
UM0196 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,119 $4,832 Implemented