IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

323

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0343 # 02 Y:2012 02 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $167,678 $90,000 Not Implemented
LE0343 # 03 Y:2012 03 2012 REPAIR OR REPLACE STEAM TRAPS $14,506 $4,200 Not Implemented
LE0343 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,536 $1,000 Not Implemented
LE0343 # 05 Y:2012 05 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,380 $6,630 Not Implemented
LE0343 # 06 Y:2012 06 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,932 $6,000 Not Implemented
LE0343 # 07 Y:2012 07 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,100 $16,000 Not Implemented
OR0588 # 06 Y:2012 06 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $631 $4,131 Not Implemented
OR0588 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $17,738 $17,500 Implemented
OR0588 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,053 $8,053 Implemented
OR0588 # 03 Y:2012 03 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,021 $10,000 Not Implemented
OR0588 # 02 Y:2012 02 2012 AVOID FROST FORMATION ON EVAPORATORS $8,968 $0 Not Implemented
OR0588 # 01 Y:2012 01 2012 IMPROVE HANDLING PRACTICES $7,884 $60 Implemented
BS0004 # 07 Y:2012 07 2012 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,240 $119 Not Implemented
BS0004 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $272 Implemented
BS0004 # 02 Y:2012 02 2012 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,756 $802 Implemented
BS0004 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,382 $5,000 Not Implemented
BS0004 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,570 $3,866 Not Implemented
BS0004 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $653 $885 Not Implemented
BS0004 # 06 Y:2012 06 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,840 $34 Implemented
OR0585 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,028 $2,305 Implemented
OR0585 # 11 Y:2012 11 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $12,086 $16,390 Implemented
OR0585 # 10 Y:2012 10 2012 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,580 $0 Not Implemented
OR0585 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,171 $1,000 Not Implemented
OR0585 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $1,776 $500 Not Implemented
OR0585 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,690 $2,000 Not Implemented