IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

172

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0106 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $548 $1,325 Implemented
IP0106 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,543 $9,687 Not Implemented
IP0106 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,159 $21,897 Implemented
OR0702 # 01 Y:2018 01 2018 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $20,800 $7,140 Not Implemented
OR0702 # 02 Y:2018 02 2018 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,088 $660 Not Implemented
OR0702 # 03 Y:2018 03 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,409 $1,005 Not Implemented
OR0702 # 04 Y:2018 04 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,065 $5,807 Not Implemented
LE0454 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,723 $1,500 Implemented
LE0454 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $300 Implemented
LE0454 # 03 Y:2018 03 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $40,361 $48,000 Implemented
LE0454 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,821 $20,500 Not Implemented
LE0454 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,855 $8,000 Implemented
LE0454 # 06 Y:2018 06 2018 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,261 $28,000 Not Implemented
LE0454 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,301 $23,000 Implemented
LE0454 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $895 $4,400 Implemented
OK0985 # 01 Y:2018 01 2018 INSTALL SET-BACK TIMERS $758 $592 Not Implemented
OK0985 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,240 $19,498 Implemented
OK0985 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,769 $21,562 Implemented
OK0985 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,033 $7,422 Implemented
OK0985 # 05 Y:2018 05 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,555 $3,157 Not Implemented
OK0985 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $79,971 $7,481 Not Implemented
GT0912 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,273 $150 Implemented
GT0912 # 02 Y:2018 02 2018 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $8,530 $142 Implemented
GT0912 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $39,033 $804 Implemented
GT0912 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,178 $1,386 Not Implemented