IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0289 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,636 $1,117 Implemented
MZ0289 # 03 Y:2020 03 2020 USE OPTIMUM THICKNESS INSULATION $3,128 $4,056 Implemented
MZ0289 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,651 $3,250 Not Implemented
MZ0289 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,151 $7,144 Implemented
MZ0289 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,118 $270 Implemented
MZ0289 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $1,422 Not Implemented
LS2006 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $796 $300 Implemented
LS2006 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,970 $1,800 Implemented
LS2006 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,740 $0 Implemented
LS2006 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $566 $375 Implemented
LS2006 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $31 $45 Not Implemented
LS2006 # 06 Y:2020 06 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,553 $7,413 Not Implemented
LS2006 # 07 Y:2020 07 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,737 $81,000 Not Implemented
AS0485 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,923 $1,064 Implemented
AS0485 # 02 Y:2020 02 2020 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $12,415 $1,195 Not Implemented
AS0485 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,573 $19,429 Implemented
AS0485 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $2,840 $1,830 Not Implemented
AS0485 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,501 $4,830 Implemented
AS0485 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $334 $130 Not Implemented
OR0736 # 01 Y:2020 01 2020 USE SYNTHETIC LUBRICANT $17,895 $672 Not Implemented
OR0736 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,946 $3,000 Implemented
OR0736 # 03 Y:2020 03 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,008 $1,549 Implemented
OR0736 # 04 Y:2020 04 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $922 $114 Implemented
OR0736 # 05 Y:2020 05 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $17,948 $212,663 Not Implemented
LS2005 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,727 $300 Not Implemented