IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0482 # 01 Y:2014 01 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $177,357 $198,000 Not Implemented
WV0482 # 16 Y:2014 16 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $507 $1,167 Implemented
WV0482 # 15 Y:2014 15 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,123 $5,400 Not Implemented
WV0482 # 14 Y:2014 14 2014 DEVELOP A REPAIR/REPLACE POLICY $3,427 $708 Implemented
WV0482 # 13 Y:2014 13 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,804 $200 Implemented
WV0482 # 12 Y:2014 12 2014 INSTALL OCCUPANCY SENSORS $6,231 $1,020 Not Implemented
WV0482 # 11 Y:2014 11 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $6,903 $1,632 Implemented
WV0482 # 10 Y:2014 10 2014 REDUCE EXCESSIVE BOILER BLOWDOWN $7,886 $8,000 Not Implemented
WV0482 # 09 Y:2014 09 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,132 $27,380 Not Implemented
WV0482 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,536 $9,000 Implemented
WV0482 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $17,822 $26,000 Implemented
WV0482 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,791 $38,441 Implemented
WV0482 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $35,144 $1,000 Implemented
WV0482 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,141 $51,865 Implemented
WV0482 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $37,833 $0 Not Implemented
WV0482 # 02 Y:2014 02 2014 REPAIR OR REPLACE STEAM TRAPS $135,791 $7,100 Implemented
NC0316 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $100 Implemented
NC0316 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $491 $321 Not Implemented
NC0316 # 02 Y:2005 02 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,570 $26,949 Not Implemented
NC0316 # 01 Y:2005 01 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,271 $87,125 Not Implemented
NC0306 # 01 Y:2004 01 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $96,975 $360,700 Not Implemented
NC0306 # 07 Y:2004 07 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,785 $100 Implemented
NC0306 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $204 $79 Not Implemented
NC0306 # 05 Y:2004 05 2004 OPERATE BOILERS ON HIGH FIRE SETTING $6,289 $2,100 Not Implemented
NC0306 # 04 Y:2004 04 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $10,305 $5,000 Implemented