IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

932

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0282 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,144 $7,160 Implemented
IC0281 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,262 $5,407 Not Implemented
IC0281 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,327 $2,879 Not Implemented
IC0281 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $1,249 $804 Implemented
IC0281 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,536 $7,857 Implemented
IC0281 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,197 $3,250 Implemented
IC0281 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $109,160 $660,787 Not Implemented
OR0771 # 02 Y:2023 02 2023 REDUCE OR ELIMINATE WASTE $56,000 $850 Not Implemented
OR0771 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $5,338 $7,581 Not Implemented
OR0771 # 01 Y:2023 01 2023 IMPROVE LUBRICATION PRACTICES $13,223 $0 Not Implemented
OR0771 # 05 Y:2023 05 2023 FILTER AND REUSE HYDRAULIC OIL $21,755 $80,000 Not Implemented
OR0771 # 03 Y:2023 03 2023 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $30,696 $13,620 Not Implemented
UD1055 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $109,446 $0 Not Implemented
UD1055 # 09 Y:2023 09 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,276 $296 Not Implemented
UD1055 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,342 $952 Not Implemented
UD1055 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $499 $675 Not Implemented
UD1055 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,617 $4,189 Not Implemented
UD1055 # 10 Y:2023 10 2023 OPTIMIZE PLANT POWER FACTOR $13,546 $36,036 Not Implemented
UD1055 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $4,478 $2,800 Not Implemented
UD1055 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $716 $0 Implemented
UD1055 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,013 $2,835 Not Implemented
UD1055 # 03 Y:2023 03 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $4,980 $600 Not Implemented
WM0200 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,827 $3,344 Implemented
WM0200 # 02 Y:2023 02 2023 USE RADIANT HEATER FOR SPOT HEATING $4,500 $12,375 Not Implemented
WM0200 # 01 Y:2023 01 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,579 $10,000 Not Implemented