IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

924

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0550 # 04 Y:1995 04 1995 REPLACE BOILER $3,542 $7,100 n/a
GT0550 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,288 $6,243 n/a
NV0016 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,667 $6,209 Not Implemented
NV0016 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $326 $285 Not Implemented
NV0016 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $875 $120 Not Implemented
NV0016 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $6,488 $1,744 Not Implemented
NV0016 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $10,116 $3,439 Not Implemented
NV0016 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,870 $1,000 Not Implemented
NV0016 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,507 $792 Not Implemented
NV0016 # 08 Y:1995 08 1995 OPTIMIZE PLANT POWER FACTOR $1,207 $900 Not Implemented
UM0012 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,061 $2,890 Implemented
UM0012 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,236 $4,084 Implemented
UM0012 # 03 Y:1994 03 1994 USE RADIANT HEATER FOR SPOT HEATING $2,542 $6,800 Not Implemented
UM0012 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,273 $1,600 Implemented
UM0012 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,888 $2,000 Not Implemented
UM0012 # 06 Y:1994 06 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $615 $500 Not Implemented
UM0012 # 07 Y:1994 07 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,836 $0 Implemented
UF0099 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,610 $5,358 Implemented
UF0099 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $165 $228 Not Implemented
UF0099 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,247 $1,883 Implemented
UF0099 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,087 $1,100 Implemented
UF0099 # 05 Y:1994 05 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $496 $1,200 Not Implemented
UF0099 # 06 Y:1994 06 1994 $100,000 $8,200 Not Implemented
UF0099 # 07 Y:1994 07 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $499 $244 Not Implemented
NC0021 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,164 $0 Implemented