IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

932

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0212 # 01 Y:2022 01 2022 REPAIR FAULTY LOUVERS AND DAMPERS $20,616 $975 Not Implemented
MZ0335 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $558 $480 Implemented
MZ0335 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $4,654 $7,600 Implemented
MZ0335 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $1,834 $680 Implemented
MZ0335 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $701 $1,200 Implemented
MZ0335 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $106,813 $957,388 Not Implemented
MZ0335 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $1,330 Implemented
MZ0335 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,141 $9,100 Not Implemented
MZ0335 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $449 $200 Not Implemented
MI0406 # 07 Y:2022 07 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,016 $100 Not Implemented
MI0406 # 06 Y:2022 06 2022 ELIMINATE/REDUCE AN OPERATION $4,770 $960 Implemented
MI0406 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $5,579 $15,821 Implemented
MI0406 # 04 Y:2022 04 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,468 $15,450 Implemented
MI0406 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,550 $2,031 Implemented
MI0406 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,075 $5,674 Implemented
MI0406 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,298 $45,090 Implemented
LE0488 # 01 Y:2020 01 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $1,217 $40 Not Implemented
LE0488 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,201 $360 Implemented
LE0488 # 03 Y:2020 03 2020 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $82,690 $150,334 Implemented
LE0488 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,465 $13,000 Implemented
LE0488 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,995 $12,420 Implemented
LE0488 # 06 Y:2020 06 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $788 $2,200 Implemented
LE0488 # 07 Y:2020 07 2020 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,905 $9,300 Implemented
UD1009 # 07 Y:2020 07 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $73,844 $147,736 Not Implemented
UD1009 # 06 Y:2020 06 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $100,517 $151,300 Not Implemented