IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0759 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $825 $6,402 Implemented
MA0759 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,502 $3,367 Implemented
MA0759 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,476 $6,333 Implemented
MA0759 # 01 Y:2016 01 2016 REDUCE VENTILATION AIR $11,226 $14,820 Not Implemented
MA0706 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $350 $450 Not Implemented
MA0706 # 01 Y:2013 01 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,814 $10,900 Implemented
MA0706 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $864 $300 Not Implemented
MA0706 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,037 $6,900 Not Implemented
MA0706 # 03 Y:2013 03 2013 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,016 $26,000 Implemented
MA0706 # 04 Y:2013 04 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,105 $100 Implemented
MA0506 # 03 Y:2002 03 2002 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $3,778 $0 Not Implemented
MA0506 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,391 $1,102 Implemented
MA0506 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $982 $3,275 Implemented
MA0506 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,289 $1,100 Implemented
MA0506 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,604 $13,500 Not Implemented
MA0506 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,554 $9,225 Implemented
MA0382 # 04 Y:1997 04 1997 USE OTHER METHODS FOR NEUTRALIZATION $457,830 $754,000 Not Implemented
MA0382 # 03 Y:1997 03 1997 USE SOY OR WATER-BASED INKS $240,201 $300,000 Not Implemented
MA0382 # 02 Y:1997 02 1997 $2,296 $5,000 Implemented
MA0382 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,752 $13,700 Not Implemented
MA0382 # 01 Y:1997 01 1997 INSULATE BARE EQUIPMENT $1,954 $1,527 Implemented
MA0382 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,713 $200 Implemented
MA0267 # 09 Y:1993 09 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $777 $0 Not Implemented
MA0267 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $2,483 $250 Implemented
MA0267 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,246 $4,899 Implemented