IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0200 # 01 Y:2023 01 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,579 $10,000 Not Implemented
WM0200 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,252 $1,288 Implemented
WM0200 # 02 Y:2023 02 2023 USE RADIANT HEATER FOR SPOT HEATING $4,500 $12,375 Not Implemented
WM0200 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,827 $3,344 Implemented
WM0200 # 04 Y:2023 04 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,847 $800 Implemented
WM0200 # 05 Y:2023 05 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,426 $750 Implemented
WM0195 # 04 Y:2023 04 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,436 $3,735 Not Implemented
WM0195 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $1,997 $1,000 Implemented
WM0195 # 03 Y:2023 03 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $5,128 $1,700 Not Implemented
WM0195 # 02 Y:2023 02 2023 USE RADIANT HEATER FOR SPOT HEATING $15,091 $13,400 Not Implemented
WM0195 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,725 $13,127 Implemented
WM0195 # 05 Y:2023 05 2023 PAY BILLS ON TIME TO AVOID LATE FEES $2,687 $0 Implemented
WM0195 # 09 Y:2023 09 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,142 $1,715 Not Implemented
WM0195 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,381 $700 Implemented
WM0195 # 08 Y:2023 08 2023 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,986 $2,700 Implemented
WI0486 # 01 Y:2005 01 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $20,351 $18,000 Not Implemented
WI0486 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,915 $1,280 Implemented
WI0486 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,600 $7,840 Not Implemented
WI0486 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,465 $0 Implemented
WI0486 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,086 $780 Implemented
WI0486 # 06 Y:2005 06 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,509 $700 Not Implemented
WI0486 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $671 $300 Not Implemented
WI0486 # 08 Y:2005 08 2005 INSTALL TIMERS AND/OR THERMOSTATS $453 $800 Implemented
WI0478 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,920 $59,780 Not Implemented
WI0478 # 07 Y:2004 07 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,125 $2,500 Not Implemented