Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

703

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0290 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $348 $452 n/a
UA0290 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,530 $5,091 n/a
UA0290 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,137 $2,005 n/a
UA0290 # 06 Y:2024 06 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $10,563 $56,271 n/a
UA0290 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $81,410 $555,652 n/a
UA0290 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $6,760 $8,397 n/a
UA0290 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $224 $224 n/a
UA0290 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,200 $500 n/a
UF0622 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $41,219 $322,608 n/a
UF0622 # 07 Y:2024 07 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,875 $6,148 n/a
UF0622 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,789 $25,360 n/a
UF0622 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $43,371 $52,879 n/a
UF0622 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,345 $12,420 n/a
UF0622 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $13,853 $3,888 n/a
UF0622 # 08 Y:2024 08 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,035 $0 n/a
UF0622 # 05 Y:2024 05 2024 UPGRADE OBSOLETE EQUIPMENT $10,345 $46,500 n/a
UF0622 # 10 Y:2024 10 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $46,005 $0 n/a
UF0622 # 09 Y:2024 09 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $16,512 $11,225 n/a
UF0622 # 12 Y:2024 12 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $3,200 $3,200 n/a
UF0622 # 11 Y:2024 11 2024 IMPROVE SPACE COMFORT CONDITIONING $30,240 $788 n/a
CI0020 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $92,262 $487,880 n/a
CI0020 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $76,570 $180,000 n/a
CI0020 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $55,349 $45,000 n/a
CI0020 # 05 Y:2023 05 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,187 $20,000 n/a
CI0020 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,503 $2,870 n/a