IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

338

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0432 # 10 Y:2003 10 2003 PAY BILLS ON TIME TO AVOID LATE FEES $213 $0 Implemented
AM0419 # 02 Y:2002 02 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,460 $1,470 Implemented
AM0419 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,250 $2,000 Implemented
AM0419 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,140 $1,140 Implemented
AM0419 # 07 Y:2002 07 2002 USE PHOTOCELL CONTROLS $555 $200 Implemented
AM0419 # 08 Y:2002 08 2002 CHECK FOR ACCURACY OF UTILITY / POWER METERS $490 $0 Implemented
AM0419 # 10 Y:2002 10 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $406 $540 Implemented
SF0236 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,279 $0 Implemented
SF0236 # 02 Y:2002 02 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,632 $440 Implemented
SF0236 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,490 $1,146 Implemented
SF0236 # 05 Y:2002 05 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,418 $5,500 Implemented
UU0003 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $2,062 $4,761 Implemented
UU0003 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,867 $140 Implemented
TA0013 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,880 $70 Implemented
TA0013 # 03 Y:2001 03 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,300 $2,190 Implemented
TA0013 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $1,590 $130 Implemented
TA0013 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $1,130 $110 Implemented
TA0013 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $660 $85 Implemented
UD0634 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,762 $400 Implemented
UD0634 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,372 $0 Implemented
UD0634 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,089 $132 Implemented
UD0634 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $704 $600 Implemented
AS0263 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,578 $5,361 Implemented
AS0263 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,763 $12,331 Implemented
AS0263 # 06 Y:1999 06 1999 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,379 $10,106 Implemented