IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0622 # 05 Y:2024 05 2024 UPGRADE OBSOLETE EQUIPMENT $10,345 $46,500 n/a
UF0622 # 11 Y:2024 11 2024 IMPROVE SPACE COMFORT CONDITIONING $30,240 $788 n/a
UF0622 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $41,219 $322,608 n/a
UF0622 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,789 $25,360 n/a
UF0622 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $13,853 $3,888 n/a
UF0622 # 07 Y:2024 07 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,875 $6,148 n/a
UF0622 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,345 $12,420 n/a
UF0622 # 12 Y:2024 12 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $3,200 $3,200 n/a
UF0622 # 08 Y:2024 08 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,035 $0 n/a
UF0622 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $43,371 $52,879 n/a
UF0622 # 09 Y:2024 09 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $16,512 $11,225 n/a
UF0622 # 10 Y:2024 10 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $46,005 $0 n/a
MI0331 # 02 Y:2018 02 2018 INCREASE EFFICIENCY OF TRUCKS $6,044 $5,800 Not Implemented
MI0331 # 11 Y:2018 11 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $1,875 Implemented
MI0331 # 10 Y:2018 10 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $962 $2,525 Implemented
MI0331 # 09 Y:2018 09 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,540 $480 Implemented
MI0331 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $1,823 $340 Not Implemented
MI0331 # 07 Y:2018 07 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,868 $531 Not Implemented
MI0331 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,515 $4,841 Not Implemented
MI0331 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $4,250 $1,400 Implemented
MI0331 # 04 Y:2018 04 2018 PAY UTILITY BILLS ON TIME $4,461 $0 Implemented
MI0331 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,170 $2,020 Not Implemented
MI0331 # 01 Y:2018 01 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,963 $15,690 Implemented
UF0418 # 02 Y:2008 02 2008 INSTALL COMMON HEADER ON COMPRESSORS $4,076 $2,560 Implemented
UF0418 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,047 $1,060 Implemented