IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

683

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0159 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,148 $0 Not Implemented
AS0159 # 03 Y:1995 03 1995 USE POWER DURING OFF-PEAK PERIODS $7,700 $50 Implemented
AS0159 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,333 $650 Implemented
AS0159 # 05 Y:1995 05 1995 USE SYNTHETIC LUBRICANT $5,086 $5,202 Implemented
AS0159 # 06 Y:1995 06 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,366 $20,000 Not Implemented
AS0159 # 07 Y:1995 07 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,926 $31,350 Not Implemented
AS0159 # 08 Y:1995 08 1995 INSULATE BARE EQUIPMENT $8,844 $6,860 Not Implemented
AS0159 # 09 Y:1995 09 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,497 $12,300 Implemented
CO0329 # 01 Y:1995 01 1995 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $8,120 $19,640 Implemented
CO0329 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,240 $5,620 Implemented
CO0329 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,960 $6,260 Implemented
CO0329 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $180 Implemented
CO0329 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $1,380 $510 Not Implemented
CO0329 # 06 Y:1995 06 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $780 $240 Implemented
UF0091 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,887 $861 Not Implemented
UF0091 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,474 $2,402 Not Implemented
UF0091 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,767 $0 Not Implemented
UF0091 # 04 Y:1994 04 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $529 $888 Not Implemented
UF0091 # 05 Y:1994 05 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,106 $4,950 Not Implemented
UF0091 # 06 Y:1994 06 1994 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,128 $40,000 Not Implemented
UF0091 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,114 $4,373 Implemented
UF0091 # 08 Y:1994 08 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,061 $1,150 Implemented
UF0091 # 09 Y:1994 09 1994 INSULATE BARE EQUIPMENT $6,510 $2,800 Implemented
UF0091 # 10 Y:1994 10 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,908 $12,000 Not Implemented
IA0084 # 01 Y:1994 01 1994 INSTALL TIMERS AND/OR THERMOSTATS $431 $390 Implemented