IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

677

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0256 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $40 Not Implemented
TT0256 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $2,540 $588 Not Implemented
TT0256 # 10 Y:2021 10 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,667 $2,040 Not Implemented
NL0057 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,211 $2,500 Implemented
NL0057 # 05 Y:2021 05 2021 USE RADIANT HEATER FOR SPOT HEATING $4,782 $15,170 Implemented
NL0057 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,345 $11,175 Implemented
NL0057 # 03 Y:2021 03 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,271 $16,980 Not Implemented
NL0057 # 02 Y:2021 02 2021 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $20,793 $13,100 Not Implemented
NL0057 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,696 $154,720 Not Implemented
MZ0305 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,825 $9,000 Implemented
MZ0305 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,692 $44,928 Implemented
MZ0305 # 06 Y:2021 06 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,689 $240 Implemented
MZ0305 # 05 Y:2021 05 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $16,340 $5,200 Implemented
MZ0305 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $579 $320 Implemented
MZ0305 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,350 $93,000 Implemented
WV0596 # 17 Y:2020 17 2020 INSULATE BARE EQUIPMENT $308 $85 Not Implemented
WV0596 # 01 Y:2020 01 2020 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING $103,798 $40,718 Implemented
WV0596 # 02 Y:2020 02 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,186 $20,034 Implemented
WV0596 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $7,560 $7,967 Implemented
WV0596 # 04 Y:2020 04 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $6,964 $30 Not Implemented
WV0596 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $6,754 $7,949 Implemented
WV0596 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,079 $10,000 Implemented
WV0596 # 08 Y:2020 08 2020 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,333 $14,200 Not Implemented
WV0596 # 09 Y:2020 09 2020 INSULATE BARE EQUIPMENT $2,311 $1,566 Implemented
WV0596 # 10 Y:2020 10 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,829 $0 Not Implemented