IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0185 # 07 Y:1997 07 1997 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $420,104 $47,500 Implemented
UF0185 # 06 Y:1997 06 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $11,000 $43,500 Implemented
UF0185 # 05 Y:1997 05 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $9,870 $31,000 Not Implemented
UF0185 # 04 Y:1997 04 1997 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,382 $32,000 Implemented
UF0185 # 03 Y:1997 03 1997 CONVERT TO INDIRECT TEMPERATURE CONTROL SYSTEM $20,417 $19,200 Implemented
UF0185 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,979 $1,725 Implemented
UF0185 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,893 $4,059 Implemented
UF0166 # 05 Y:1997 05 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $15,282 $0 Implemented
UF0166 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,676 $18,899 Implemented
UF0166 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $954 $5,432 Implemented
UF0166 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,538 $2,350 Implemented
UF0166 # 04 Y:1997 04 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,147 $2,000 Not Implemented
UF0091 # 09 Y:1994 09 1994 INSULATE BARE EQUIPMENT $6,510 $2,800 Implemented
UF0091 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,887 $861 Not Implemented
UF0091 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,474 $2,402 Not Implemented
UF0091 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,767 $0 Not Implemented
UF0091 # 04 Y:1994 04 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $529 $888 Not Implemented
UF0091 # 05 Y:1994 05 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,106 $4,950 Not Implemented
UF0091 # 06 Y:1994 06 1994 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,128 $40,000 Not Implemented
UF0091 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,114 $4,373 Implemented
UF0091 # 08 Y:1994 08 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,061 $1,150 Implemented
UF0091 # 10 Y:1994 10 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,908 $12,000 Not Implemented
UF0020 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,332 $16,490 Implemented
UF0020 # 04 Y:1992 04 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,160 $1,320 Implemented
UF0020 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $94 $643 Not Implemented