IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0336 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $3,716 $10,200 Not Implemented
OR0336 # 03 Y:1999 03 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $27,050 $8,200 Not Implemented
OR0336 # 02 Y:1999 02 1999 INSTALL SENSORS TO DETECT DEFECTS $31,700 $0 Implemented
OR0336 # 01 Y:1999 01 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $93,600 $200,000 Implemented
OR0337 # 05 Y:1999 05 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,000 $28,700 Implemented
OR0337 # 04 Y:1999 04 1999 USE LESS WASTEFUL PACKAGING $34,000 $73,000 Not Implemented
OR0337 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $9,949 $13,663 Implemented
OR0337 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,060 $0 Implemented
OR0337 # 01 Y:1999 01 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $44,432 $21,400 Not Implemented
OR0280 # 05 Y:1996 05 1996 RECOVER AND REUSE WASTE MATERIAL $174 $0 Not Implemented
OR0280 # 04 Y:1996 04 1996 OPTIMIZE PLANT POWER FACTOR $2,830 $9,700 Not Implemented
OR0280 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,986 $15,828 Implemented
OR0280 # 02 Y:1996 02 1996 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,940 $2,500 Not Implemented
OR0280 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,576 $0 Implemented
OR0195 # 04 Y:1993 04 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $5,474 $0 Implemented
OR0195 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $9,991 $10,187 Implemented
OR0195 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,279 $6,675 Not Implemented
OR0195 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,031 $2,722 Implemented
OR0195 # 01 Y:1993 01 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $154 $0 Implemented
OR0191 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $8,272 $13,663 Implemented
OR0191 # 05 Y:1993 05 1993 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $36,422 $41,000 Implemented
OR0191 # 04 Y:1993 04 1993 OPTIMIZE PLANT POWER FACTOR $5,843 $12,300 Not Implemented
OR0191 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,156 $7,425 Not Implemented
OR0191 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $438 $567 Implemented
OR0191 # 01 Y:1993 01 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,984 $400 Implemented