IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0091 # 08 Y:1994 08 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,061 $1,150 Implemented
UF0091 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,114 $4,373 Implemented
UF0091 # 06 Y:1994 06 1994 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,128 $40,000 Not Implemented
UF0091 # 05 Y:1994 05 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,106 $4,950 Not Implemented
UF0091 # 04 Y:1994 04 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $529 $888 Not Implemented
UF0091 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,767 $0 Not Implemented
UF0091 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,474 $2,402 Not Implemented
UF0091 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,887 $861 Not Implemented
UF0091 # 09 Y:1994 09 1994 INSULATE BARE EQUIPMENT $6,510 $2,800 Implemented
UF0091 # 10 Y:1994 10 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,908 $12,000 Not Implemented
IA0084 # 02 Y:1994 02 1994 OPTIMIZE PLANT POWER FACTOR $6,631 $22,020 Not Implemented
IA0084 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $193 $516 Not Implemented
IA0084 # 06 Y:1994 06 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $325 $150 Not Implemented
IA0084 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,758 $250 Implemented
IA0084 # 04 Y:1994 04 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,074 $800 Not Implemented
IA0084 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $5,786 $545 Not Implemented
IA0084 # 01 Y:1994 01 1994 INSTALL TIMERS AND/OR THERMOSTATS $431 $390 Implemented
SD0071 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,613 $0 Implemented
SD0071 # 06 Y:1994 06 1994 INSTALL TIMERS AND/OR THERMOSTATS $587 $300 Implemented
SD0071 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $881 $3,241 Implemented
SD0071 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,220 $1,800 Not Implemented
SD0071 # 09 Y:1994 09 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,892 $240 Not Implemented
SD0071 # 04 Y:1994 04 1994 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,815 $8,515 Not Implemented
SD0071 # 03 Y:1994 03 1994 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $15,214 $24,880 Implemented
SD0071 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $473 $136 Implemented