IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

397

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0685 # 02 Y:2000 02 2000 REPROCESS SPENT OILS ON SITE FOR RE-USE $13,650 $11,650 Implemented
GT0685 # 03 Y:2000 03 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $714 $500 Implemented
GT0685 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $28,840 $7,000 Implemented
GT0685 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,955 $0 Implemented
UF0232 # 02 Y:1999 02 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,006 $60 Implemented
UF0232 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,521 $1,500 Implemented
UF0232 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $1,539 $834 Implemented
UF0232 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,215 $0 Implemented
UF0232 # 06 Y:1999 06 1999 USE PLASTIC PALLETS INSTEAD OF WOOD $25,200 $14,070 Implemented
UF0232 # 08 Y:1999 08 1999 $15,848 $75,000 Implemented
GT0669 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,756 $60,795 Implemented
GT0669 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $641 $1,250 Implemented
GT0669 # 03 Y:1999 03 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,935 $6,800 Implemented
GT0669 # 05 Y:1999 05 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $113,437 $0 Implemented
GT0669 # 06 Y:1999 06 1999 KEEP EQUIPMENT CLEAN $2,200 $1,000 Implemented
GT0669 # 07 Y:1999 07 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,844 $32,000 Implemented
GT0669 # 08 Y:1999 08 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $550 $200 Implemented
UF0219 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,814 $2,600 Implemented
UF0219 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $820 $1,200 Implemented
MA0433 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,317 $3,950 Implemented
AS0243 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,800 $80 Implemented
KU0508 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,850 $5,030 Implemented
KU0508 # 02 Y:1998 02 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,900 $7,180 Implemented
KU0508 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $470 $350 Implemented
KU0508 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $440 $100 Implemented