Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
884
matching recommendationsSIC | 3085 | Plastics Bottles |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0843 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,289 | $4,698 | Implemented |
UD0843 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,854 | $0 | Implemented |
UD0843 # 07 Y:2011 | 07 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,212 | $5,000 | Not Implemented |
UD0843 # 08 Y:2011 | 08 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $509 | $0 | Implemented |
UD0843 # 09 Y:2011 | 09 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,145 | $650 | Implemented |
AM0597 # 01 Y:2011 | 01 | 2011 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $21,840 | $0 | Implemented |
AM0597 # 02 Y:2011 | 02 | 2011 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $6,900 | $0 | Implemented |
AM0597 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,470 | $750 | Implemented |
AM0597 # 04 Y:2011 | 04 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,970 | $0 | Implemented |
AM0597 # 05 Y:2011 | 05 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,070 | $1,748 | Not Implemented |
AM0597 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $800 | $0 | Not Implemented |
UA0058 # 01 Y:2011 | 01 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,454 | $10,130 | Not Implemented |
UA0058 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,593 | $800 | Not Implemented |
UA0058 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,323 | $2,200 | Implemented |
UA0058 # 04 Y:2011 | 04 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $1,325 | $340 | Implemented |
UA0058 # 05 Y:2011 | 05 | 2011 | REDUCE VENTILATION AIR | $6,532 | $4,798 | Implemented |
UA0058 # 06 Y:2011 | 06 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $45,899 | $74,275 | Implemented |
UA0058 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,336 | $19,786 | Implemented |
UA0058 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $1,398 | $448 | Not Implemented |
OK0806 # 01 Y:2011 | 01 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $109,231 | $57,500 | Not Implemented |
OK0806 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,484 | $37,707 | Implemented |
OK0806 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,177 | $38,005 | Implemented |
OK0806 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,415 | $7,724 | Implemented |
OK0806 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,172 | $1,600 | Implemented |
OK0806 # 06 Y:2011 | 06 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,602 | $414 | Implemented |