IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

884

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0490 # 03 Y:1996 03 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,080 $100 Not Implemented
UD0490 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,214 $11,929 Not Implemented
UD0490 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,300 $500 Not Implemented
UD0474 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $17,216 $20,000 Implemented
UD0474 # 02 Y:1995 02 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,332 $14,000 Not Implemented
UD0474 # 03 Y:1995 03 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,945 $0 Not Implemented
UD0474 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,696 $2,857 Not Implemented
UD0474 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $4,012 $300 Implemented
UD0474 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,825 $2,000 Not Implemented
HO0112 # 01 Y:1995 01 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $4,084 $0 Implemented
HO0112 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $566 $250 Not Implemented
HO0112 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $502 $0 Not Implemented
HO0112 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,162 $300 Implemented
HO0112 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $240 $160 Not Implemented
HO0112 # 06 Y:1995 06 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,942 $500 Implemented
NC0058 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $149 $292 Implemented
NC0058 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,902 $30,410 Implemented
NC0058 # 03 Y:1995 03 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,940 $10,000 Not Implemented
NC0058 # 04 Y:1995 04 1995 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $19,158 $80,000 Not Implemented
NC0058 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,618 $2,500 Implemented
NC0058 # 06 Y:1995 06 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $20,246 $4,000 Not Implemented
NC0058 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,975 $240 Implemented
NC0058 # 08 Y:1995 08 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,702 $0 Implemented
NC0058 # 09 Y:1995 09 1995 INSULATE BARE EQUIPMENT $4,862 $1,500 Not Implemented
GT0554 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,760 $21,380 Implemented